What we did

B&D Industries, Inc. was part of the design-build team to construct PNM’s 32,000 square foot Data Center. The building consisted of 27,000 square feet of raised computer flooring. This unique challenge required B&D to complete all of the over head and under floor prior to dropping the floor in place. B&D installed all of the electrical, lighting, fire alarm security/access controls, three generators and a complex transformer switching system for emergency power. B&D equipped the building with a 3,000 amp double ended switchgear system with a 480 volt circuit breaker. Also, voice and data communications were installed in the administrative portion of the building.

B&D worked with the HVAC Contractor, IT Contractor and General Contractor very closely to schedule the work processes to ensure a coordinated effort. In addition, B&D worked with the engineering firm to commission the electrical system for a LEED certification. This was the first LEED Silver certified data center in the United States.

B&D received an award for Exemplary Work from the Associated General Contractors of America for this project.

WE CAN HELP YOU ON YOUR NEXT PROJECT

Related Projects

Start typing and press Enter to search