OVERVIEW

OWNER: NOVA Corporation
LOCATION: Albuquerque, NM
COMPLETION DATE: June 2015
INDUSTRY SERVED: Research and Development
CAPABILITIES: Electrical, Data Com

WHAT WE DID

B&D performed the build-out of the data center that consisted of installing (2) 3,000 amp power skids, (1) 3-section, 3,000 amp generator switchgear and (4) 800kW 1,000 kVA generators in parallel for the data center. We extended (2) 3,000 amp utility power circuits from (2) main switchboards to (2) power skids for “A” power, then extended the power from (4) 800kW 1,000kVA generators to switch gear and from switchgear to each power skid for “B” power. B&D installed (8) 800amp Power Distribution Units inside the data center. The fit-out involved B&D installing interior and exterior LED light fixtures.